Lanes turning left and right will be created at the intersection of Balmazújvárosi and Füredi út, as well as Csigekert and Szabó Lőrinc utca.
At the intersection of Balmazújváros and Füredi streets, as well as Csigekert and Szabó Lőrinc streets, quite a lot of traffic passes through. Because of this, congestion occurs regularly during peak hours. In order to solve the situation, separate lanes to the right and left will help to move forward, and the pavement will be strengthened on one section, the politician said in his report.
The investor Nemzeti Infrastruktúra Fejlesztő Zrt. is looking for a contractor to perform the task, which can be applied until March 24.
According to the tender, the replacement of the affected utilities is also part of the task. The contractor must build the missing 120-meter cycle path section on Szabó Lőrinc Street together with the connection to the existing Füredi út cycle path. in addition, a 200-meter service road must be built to ensure safe access to the properties close to the junction on Szabó Lőrinc Street.
debreceninap.hu